A construction state diagram from a draft plan through submission and review. Approval continues into build and final inspection, while a required fix returns the plan to draft.
State diagrams

Construction Compliance States

State machine for plan review and inspections.

Diagram type

State diagrams

Access level

Free

Last updated

11 months ago

User comments

Share your ideas, questions, or improvements below.

Comments are powered by Remark42.

Template description

The machine starts at DraftPlan, moves to SubmittedPlan, and then to Reviewing. Reviewing splits. Approved continues to BuildPhase, then FinalInspection, then Completed. FixRequired returns to DraftPlan, not to Reviewing and not to SubmittedPlan. A plan that needs a fix becomes a draft again, so it must be submitted before anyone reviews it a second time. BuildPhase is reachable only from Approved. There is no arrow from Reviewing into construction, and the final inspection has no failure path in this drawing. Completed is a single end after a passed inspection.

When to use it

Use it when a site team wants to build from a plan that is still in review, or when a fix is being treated as a comment that stays inside Reviewing. The return to DraftPlan is the arrow that says the paperwork starts over. The inspection arrow says this picture has no drawn rejection at the end.

How to adapt it

Rename the states to the permit language you use. If a fix should return only to SubmittedPlan, move that arrow. Add a failed-inspection state if the final visit can reject the work, and point it where the rework actually starts. Insert an authority name on Reviewing if more than one office must agree. Do not connect DraftPlan directly to BuildPhase.